The Town will be posting the draft 2023 Stormwater Annual Report for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems (MS4). The report will be available for public review and comment on the Engineering Page of the Town of Branford’s Website on February 15th, 2024. Comments will be received through March 15,2024 and can be emailed to engineering@branford-ct.gov or submitted at the Engineering Department, located on the 2nd floor of Town Hall.